Letter Re: Dakota Access Pipeline
As a resident of North Dakota and having to hear about this every day, the facts are: The pipeline is in a corridor with another older line that goes under the water (90 feet below the riverbed); The water intake for the reservation is a moot point. The old intake at Ft. Yates will be replaced on 1/1/17 with an intake another 70 miles away from the crossing; The Standing Rock tribe was asked for input on the pipeline at least six times, and they never bothered to show up; During the design of the line, it was rerouted in …